Session Details

Title Engineering Seismology
Chairs Kazuaki Masaki, Yih-Min Wu
Date/Time October 18, 13:20 ~ 15:20
Location R101
PaperNOPaper
260
A STUDY ON DISTINGUISHING BETWEEN EARTHQUAKE SIGNAL AND NON-EARTHQUAKE SIGNAL FOR ON-SITE EARTHQUAKE EARLY WARNING SYSTEM
Rih-Teng Wu, Ting-Yu Hsu, Kuo-Chun Chang
Earthquake Early Warning System, signal processing, Singular Spectrum Analysis, Support Vector Classification
261
OFF-LINE SIMULATION OF ON-SITE PEAK GROUND ACCELERATION ESTIMATION BASED ON SUPPORT VECTOR REGRESSION
Kuo-Liang Wen, Ting-Yu Hsu, Shyu-Yu Wu, Shieh-Kung Huang, Hung-Wei Chiang, Pei-Yang Lin, Tao-Ming Chang, Kung-Chun Lu
Early Earthquake Warning System, false negative rate, false positive rate, prediction accuracy rate, support vector regression method, TauC-Pd-Attenuation method
175
DEVELOPMENT OF EARTHQUAKE EARLY WARNING SYSTEM USING LOW COST ACCELEROMETER IN TAIWAN
Yih-Min Wu
earthquake early warning, MEMS sensor, real-time seismology, seismic hazards mitigation
109
EARLY WARNING TECHNIQUE FOR DETECTING DETERIORATION OF LAMINATED RUBBER BEARING BY USING AE METHOD
Yuma Kawasaki, Naoto Teramura, Kazuyuki Izuno
acoustic emission, AE parameter, laminated rubber bearing, non-destructive test
125
GROUND MOTION ESTIMATION USING FRONT SITE WAVE FORM DATA BASED ON SPARSE BAYESIAN MODEL FOR EARTHQUAKE EARLY WARNING
Yang Yincheng
earthquake early warning, regional warning, RVM
177
PREDICTING PEAK GROUND ACCELERATION USING ARTIFICIAL NEURAL NETWORK WITH P WAVE FEATURES FOR ON-SITE EARTHQUAKE WARNING SYSTEM IN TAIWAN
Shieh-Kung Huang, Chi-Hang Li, Zhe-Ping Shen, Ting-Yu Hsu, Shyu-Yu Wu
artificial neural network, earthquake early warning, on-site, P-wave feature
231
EARTHQUAKE EARLY WARNING SYSTEM TO MITIGATE EARTHQUAKE DAMAGE IN FACILITIES IN THE TOKAI INDUSTRIAL REGION, CENTRAL JAPAN
Kazuaki Masaki, Susumu Kurahashi
Earthquake Early Warning, Evacuation
37
EXPERIMENTAL STUDY ON MECHANICAL BEHAVIOR OF ANCHOR BOLTS AND SURROUNDING CONCRETE UNDER COMBINED LOADING
Yuki Shirai, Satoshi Yamada
bonded anchor bolts, combined loading, headed anchor bolts
Subtotal: 8 papers